Supply, delivery, installation, testing and commissioning of 30 metres solar powered high mast flood light in IFO 2 settlement in Dadaab.

Open: 5 May, 2026 Close: 22 May, 2026
Energy Solar Photovoltaic PV Energy
Select a Plan